ROAD DIVISION

Division director: Balázs Mentes, gr. construction engineer
Staff together with external professional partners: 45
Number of contracts completed and under completion in 2017: 31

OUR MAJOR PROJECTS

Construction of express road M85-M86, construction of Csorna bypass road, Phase I
12.5 km-long new express road with 17 bridge structures. The aim of the project was to relieve the transit traffic load from the town of Csorna, amounting to 20 thousand vehicles per day. As such, in addition to transport development aspects, the project also contributed to improve the quality of urban life.

Project cost: 30 billion HUF.

Our assignment: construction supervision, complete project management (in consortium with Főber Ltd, Utiber Ltd and Transinvest-Budapest Ltd)

Construction of the Zalalövő bypass section of National road no. 86 between km sections 25+499-36+360
National road no. 86 bypasses the town of Zalalövő from the east between km sections 25+499-36+360. The project involved pavement reinforcement in a 2.5 km section of the existing road and the construction of 10.7 km new road. Two important engineering structures were built with the new route, among them the supervision of a 600 m-long new bridge construction, mounted on the spot, was a challenging task for our Team.

Project cost: 13.7 billion HUF.

Our assignment: construction supervision, complete project management (in consortium with OVIBER Ltd)

Construction of National road no. M30-26, bypass section of Miskolc, Project Phase II
In the Project Phase II., the National road no. M30-26, bypass section of Miskolc, transport development, environmental and flood protection tasks were also included. The completed road has a flood protection function, it serves as a dam at the Sajó river. The construction of a 4500 m long flood control ditch and a 752,275 m3 capacity flood-plain was also part of the project.

Project cost: 14.2 billion HUF.

Our assignment: construction supervision, complete project management (in consortium with OVIBER Ltd and VIA-Pontis Ltd)

Construction of express road M86, construction of the Hegyfalu – Csorna section
The Hegyfalu-Csorna section, opened to the traffic in October 2016, was the last section in the development of express roads M85-M86. With its completion, the town of Szombathely was finely linked to the National express road network. The 2x2 lane, 33.4 km-long express road was the longest express road construction project of ECO-TEC.

Project cost: 66 billion HUF.

Our assignment: construction supervision, complete project management (in consortium with Főber Ltd)